|
Gaomi punch precautions required during installationHigh-density punching machines and equipment widely used in electronics, telecommunications, computers, household appliances, furniture, vehicles, metal parts stamping and forming. Punch design principle is to convert the circular motion into linear motion, output from the main motor, a flywheel driven by the operation of the clutch drive gear, a crankshaft (or eccentric gear), a link, etc., to achieve linear movement of the slider from the main motor to circular motion of the moving rod. Then press needs attention when installing it? Today, let us take a look! 1. The packing list are complete wearing parts and accessories, while the punch should be placed three to four days in a dry place, to drive off the moisture in the motor and the electrical apparatus, measuring instruments applied when necessary, to check the electrical insulation is good. ,reliable. 2. FIG After pouring good foundation base, base until solidified, the press safely placed on top, with the horizontal level of the work surface to check the press, the length of each 1OOO deviation of not greater than 0.3 mm mm. 3. After the punch correction level, installed anchor bolts, concrete is poured in the square hole, to be completely solidified concrete to start. 4. After installation, the rust preventive oil kerosene clean the surface of the device, care not to damage the paint surface cleaning, while the cleaning of each hole, and an oil passage cups, allowed to use a metal or emery cloth during cleaning punch density. Then you should check the ground wire is connected. |